« Making the old new | Main | Elephant + Sheep = Big Sweater »

Ginevra Update

(Artsy Hipstamatic iPhone pic)

As I've moved past the waist increases and decreases on the body, and reached the part of the instructions that say to knit until the body reaches the final length, I decided to put Ginevra on some waste yarn and get a feel for the fit and length.

The picture is somewhat deceiving because of the big open neck.

It appears as if I'm barely to the waist, but in actuality the sweater is just about 2 inches shy of an acceptable length. At this point, I have 3 skeins of yarn left. I think that I'll be working on the sleeves to see how much yarn I have left and base the final length on that. The malabrigo is knitting up into a nice heavy sweater, so a 3/4 length sleeve might be a good idea.

With a push, I could probably have this finished in a week. My goal, however, is to have a pretty new sweater for the 1st day of classes in about 3 weeks.

Comments (1)

kim:

test

Post a comment


About

This page contains a single entry from the blog posted on January 4, 2011 10:09 PM.

The previous post in this blog was Making the old new.

The next post in this blog is Elephant + Sheep = Big Sweater.

Many more can be found on the main index page or by looking through the archives.

Powered by Movable Type 5.031
Hosted by LivingDot